Skip to content
 

Contact(s)

 

Consultation Materials

All of the rapid transit consultation materials can be searched below by the year the event was held.

2014  2013  201220112009200820072006 20052004

Phase 2, Step 2: Routes and Station Locations - Public Workshops March 20, 21 & 22, 2007

After reviewing public input, several revisions were made to the routes and station locations to be evaluated. The following are the Final Route and Station Location Alternatives Maps to be further evaluated:

21 criteria were used to evaluate the routes and station locations above.

Phase 2 Step 1: Route Design and Technologies - Public Consultation Centre January 9, 10 & 11, 2007

Designed by eSolutionsGroup