Skip to content
 

Contact(s)

 

The Region of Waterloo is releasing the Project Agreement for the Light Rail Transit (LRT) System which implements the LRT public-private partnership. The essential elements of the agreement, including all costs to the Region, have been reported in previous public reports to Regional Council. The Municipal Freedom of Information and Privacy Act provides for certain exemptions, especially when proprietary information for third parties is involved. There are some components which have been redacted at the request of third parties.

 

 

 

Project Agreement

Schedule 1

Schedule 2 Completion Documents

Schedule 3 Custody Agreement

Schedule 4 Lenders Direct Agreement

Schedule 5 Direct Agreements

Schedule 8 Not included in the Project Agreement

Schedule 10 Review Procedure

Schedule 11 Quality Management

Schedule 12 Not included in the Project Agreement

Schedule 13 Project Co Proposal Extract

Schedule 14 Commissioning

Schedule 15 Article 1 Definitions

Schedule 15 Article 2 Acronyms

Schedule 15 Article 3 Cited References

Schedule 15-2 Appendix A System Description

Schedule 15-2 Appendix B Geotechnical Data

Schedule 15-2 Appendix E Tree List

Schedule 15-2 Appendix F Region of Waterloo Community Engagement Strategy

Schedule 15-2 Appendix G General Drawings

Schedule 15-2 Appendix Existing Conditions

Schedule 15-2 Appendix I Alignment & OMSF Drawings Part 1

Schedule 15-2 Appendix I Alignment & OMSF Drawings Part 2

Schedule 15-2 Appendix I Alignment & OMSF Drawings Part 3

Schedule 15-2 Appendix I Alignment & OMSF Drawings Part 4

Schedule 15-2 Appendix I Alignment & OMSF Drawings Part 5

Schedule 15-2 Appendix I Alignment & OMSF Drawings Part 6

Schedule 15-2 Appendix I Alignment & OMSF Drawings Part 7

Schedule 15-2 Appendix I Alignment & OMSF Drawings Part 8

Schedule 15-2 Appendix J Standard Details

Schedule 15-2 Appendix K ITS Block Diagram

Schedule 15-2 Appendix M Utility Drawings and Matrix

Schedule 15-2 Appendix N Public Infrastructure Works

Schedule 15-2 Appendix O Early Works Drawings

Schedule 15-2 Appendix P Concrete Road Base Drawing

Schedule 15-2 Appendix Q GRT Standards

Schedule 15-2 Appendix R Conceptual Renderings

Schedule 15-2 Appendix S King and Moore St

Schedule 15-2 Appendix T Concept Plan Huron Spur

Schedule 15-2 Appendix U Design Management

Schedule 15-2 Appendix V Traffic Quality Management Plan

Schedule 15-2 Appendix W Average Daily Traffic Count Information

Schedule 15-2 Appendix X Rail Agreements (Huron Spur)

Schedule 15-2 Appendix X Rail Agreements (King Street Grade Separation)

Schedule 15-2 Appendix Y Traffic Control

Schedule 15-2 Appendix Z Traction Power Substations (Kitchener)

Schedule 15-2 Appendix Z Traction Power Substations (Waterloo)

Schedule 15-2 Article 1 Management Provisions

Schedule 15-2 Article 2 Civil

Schedule 15-2 Article 3 Utility Infrastructure

Schedule 15-2 Article 4 System Environmental Design Criteria

Schedule 15-2 Article Article 6 Traction Electrification System

Schedule 15-2 Article 7 Energy Management Plan

Schedule 15-2 Article 8 Train Control Systems

Schedule 15-2 Article 9 Intelligent Transportation Systems

Schedule 15-2 Article 10 Communications

Schedule 15-2 Article 11 Track Alignment and Wayside Clearances 

Schedule 15-2 Article 12 Trackwork 

Schedule 15-2 Article 13 VTAC

Schedule 15-2 Article 14 LRT Stops and Stop Equipment 

Schedule 15-2 Article 15 Structures

Schedule 15-2 Article 16 OMSF

Schedule 15-2 Article 17 Corrosion Control and Grounding

Schedule 15-2 Article 18 Construction Criteria

Schedule 15-2 Article 19 Project Schedule 

Schedule 15-2 Article 20 Fire Life Safety

Schedule 15-3 Appendix A Asset Preservation

Schedule 15-3 Appendix B Expiry Date Requirements

Schedule 15-3 Appendix C Maintenance Responsibility Table

Schedule 15-3 Appendix D Baseline Service Plans 2017 to 2047

Schedule 15-3 Article 1 Maintenance & Rehabilitation Requirements

Schedule 15-3 Article 2 Safety and Security Program

Schedule 15-3 Article 3 System Service Availability Requirements

Schedule 15-4 Article 1 Operations Requirements

Schedule 16 Title Encumbrances

Schedule 17 Environmental Obligations

Schedule 18 Communications and Public Consultation Protocol

Schedule 19 Heritage Guidelines and Protocols

Schedule 20 Payment Mechanism 

Schedule 21 Construction Period Payments

Schedule 22 Variation Procedure

Schedule 23 Compensation and Termination

Schedule 24 Expiry Transition Procedure

Schedule 25 Insurance and Performance Security Requirements

Schedule 26 Record Provisions

Schedule 27 Dispute Resolution Procedure

Schedule 28 Refinancing

Schedule 29 Standby Letter of Credit

Schedule 30 Insurance Trust Agreement

Schedule 33 Works Report Requirements

Schedule 34 Transition Out Requirements - Operations Services

Schedule 36 Not included in the Project Agreement

Schedule 37 - System Extension

Schedule 38 Not included in the Project Agreement

Schedule 39 Not included in the Project Agreement

Schedule 40 - Intellectual Property

 

 

 

 

 

 

 

 

Designed by eSolutionsGroup